Flanges, butt-weld and forged fittings for Shimla's water & utility and hydro power units, made at our ISO 9001:2015 works in Mumbai, dispatched from stock in 24–48 h and delivered in about 4 days, with EN 10204 3.1 certificates.
Municipal water distribution, water treatment & supply mains: Mild Steel Flanges, Concentric Reducers, Weld Bends.
Ex-stock dispatch from Mumbai in 24–48 h, then road freight to Shimla.
Heat numbers marked on every piece; third-party inspection accepted.
Carbon, alloy, stainless and duplex grades held in stock.

Shimla's buyers order piping hardware for concrete reasons: State utilities, hydel project procurement (SJVN belt), water supply schemes. From our Mumbai works we supply weld neck flanges, blind flanges and long weld neck flanges into State capital; hydel project offices, in A105, A350 LF2 (low-temp) — dimensioned to ASME B16.5/B16.11 and certified to EN 10204 3.1.
At Remax Forge & Fittings, every order is built to the governing standard. For high-pressure steam, oil and gas, and chemical utilities, all piping hardware is manufactured under a certified ISO 9001:2015 quality management system in our Mumbai facility. Before dispatching any order to Shimla, every item undergoes rigorous destructive and non-destructive quality testing. This includes Positive Material Identification (PMI), hydrostatic pressure testing, ultrasonic flaw detection, and dimensional audits to ASME B16.5, B16.47, and B16.11 standards. Every dispatch is accompanied by an EN 10204 3.1 Mill Test Certificate (MTC), dimensional reports, and compliance docs.
Shimla's demand for flanges and fittings comes mainly from State utilities, hydel project procurement (SJVN belt), water supply schemes. Utility and infrastructure projects mainly need mild steel flanges in PN10/PN16 or Class 150, reducers and long-radius bends for distribution mains. Hydro-power and water-infrastructure projects order large-bore flanges, spectacle blinds and concentric reducers for penstock bypass, cooling-water and dewatering lines.
Stock items for Shimla are dispatched from Mumbai in 24–48 hours and reach site by road in about 4 days (NH48 via Delhi–Chandigarh). Non-stock sizes and custom forgings run 7–15 working days. Send your size, class, facing, grade and pipe schedule, or simply the BOQ or line list, and we will quote line by line.
Every lot ships with an EN 10204 3.1 mill test certificate, and heat numbers are marked on each piece so they can be traced back to it. Alloy and stainless items can be PMI-checked before dispatch, and inspection by your own or a third-party agency is welcome at our works. We use the same route to serve Dharamshala, Solan, Mandi and Baddi, so mixed orders for plants in the region can be planned together.
| Service | Flanges & fittings usually specified |
|---|---|
| Pumping & distribution mains | MS / A105 slip-on and plate flanges, PN10 / PN16 or Class 150 |
| Penstock bypass & dewatering | Large-diameter flanges to ASME B16.47 Series A / B |
| Treatment plant piping | SS 304 / 316 flanges, concentric reducers and weld bends |
| Isolation points | Spectacle blinds and blind flanges sized to the line class |

Weld neck, slip-on, blind and threaded flanges to ASME B16.5 / B16.47 in A105, A350 LF2 (low-temp), Class 150–2500, for water & utility piping in Shimla.

ASME B16.9 elbows, tees, concentric and eccentric reducers and caps, seamless or welded and matched to your pipe schedule, for hydro power lines in Shimla.

ASME B16.11 socket-weld and threaded fittings in 3000# and 6000# (9000# on request) for small-bore drain, vent, instrument and hydraulic lines at hydro power units in Shimla.
Flanges and forged fittings are made under an ISO 9001:2015 quality system at our Mumbai works. Alloy and stainless lots get 100% PMI, and hydrostatic, ultrasonic, radiography and magnetic particle testing are available on request. Every dispatch ships with an EN 10204 3.1 MTC.
CNC machining and in-house forging cover standard and drawing-based parts: forged fittings in 2000#, 3000#, 6000# and 9000#, and flange faces in RF, FF, RTJ, tongue & groove and male-female.
We export to 45+ countries, including the UAE, USA and Saudi Arabia. Common sizes and grades are held in stock, so ex-stock orders are dispatched within 24–48 hours.
Our team helps you pick the pressure class, material grade and face type for your service conditions. You are welcome to audit the Mumbai works in person or by video before ordering.
Precision-engineered components for mission-critical environments.

Municipal water distribution, water treatment & supply mains
Mild Steel Flanges, Concentric Reducers, Weld Bends

High-volume water diversion, penstocks & cooling loops
Large-Diameter Flanges, Concentric Reducers
Route: NH48 via Delhi–Chandigarh. Ex-stock dispatch 24–48 h from Mumbai; road freight ≈ 4 days to Shimla. Custom forgings: 7–15 working days. Packing: seaworthy crates/pallets with rust-preventive coating. Docs: invoice, packing list, 3.1 MTC, test reports.
Wooden crates or pallets, with rust-preventive coating and wrapping to protect machined faces in transit and site storage.
Invoice, packing list, EN 10204 3.1 MTC, PMI reports, hydro test reports, and IBR documentation (if applicable) are dispatched with every order.


























































































We deliver Weld Neck Flanges, Blind Flanges, Long Weld Neck Flanges and Alloy Steel Pipess to Shimla in A105, A350 LF2 (low-temp), dimensioned to ASME B16.5, B16.47 and B16.11. Demand here comes mainly from hydro power & water infra and public utilities & water — including units around State capital; hydel project offices — and every lot ships with EN 10204 3.1 certification.
Yes. Hydel and water-infrastructure projects in the Shimla region use ASME B16.47 Series A/B large-bore weld necks, long weld necks and blinds, typically in A105 or low-temperature A350 LF2. We supply these with hydro test certificates and 3.1 MTCs sized to project drawings.
Honestly: ex-stock items dispatch from our Mumbai warehouse within 24–48 hours and reach Shimla in roughly 4 days by road (NH48 via Delhi–Chandigarh). Custom forgings add 7–15 working days of production. We confirm a dated schedule with every quotation rather than promising blanket next-day delivery.
We deliver door-to-site across Shimla, including State capital; hydel project offices, and to nearby Dharamshala, Solan, Mandi and Baddi. Goods leave our Mumbai stock within 24–48 hours and travel by road on NH48 via Delhi–Chandigarh, normally arriving in about 4 days.
No — and we say so plainly. Manufacturing, stock and testing are at our ISO 9001:2015 facility in Mumbai; Shimla is served through scheduled road dispatches with full documentation. Buyers are welcome to audit the Mumbai works in person or by video inspection before ordering.
Every Shimla dispatch includes EN 10204 3.1 mill test certificates, dimensional reports and hydro/NDT test reports as ordered. 100% PMI is standard on alloy and stainless lots.